English
About Us

Product Range & Capability Matrix

Product Range · Capability Boundary · Standard

What Kaxite Makes — and Where the Capability Boundary Sits Gaskets · Braided Packing · Compression Sheets · PTFE Seals · Sealing Machines

A supplier that claims to do everything is a supplier a buyer cannot plan around. The matrix below states the material range, size range, pressure, temperature, standard, and lead time for each product family — and the cases we review individually rather than accept by default.

Check Your Specification →

Capability Matrix by Product Family

Product family Material range Size range Pressure Temperature Standard Lead time
Spiral Wound Gaskets SS304/316/316L, Monel, Inconel + graphite / PTFE / ceramic / mica filler Up to 3000 mm OD Per ASME B16.20 -200 to +650 °C ASME B16.20, API 601 15–30 days
Ring Joint Gaskets Soft iron, SS, Monel, Inconel R / RX / BX series Up to 3000 bar Per material API 6A, ASME B16.20 15–30 days
Kammprofile / Jacket / Corrugated Graphite, PTFE, mica, non-asbestos + metal core or jacket Up to 3000 mm Per construction -200 to +650 °C DIN, BS, JIS 15–30 days
Braided Packing PTFE, graphite, aramid, carbon fiber, mineral fiber 3–50 mm section Per construction -200 to +1050 °C API 622 15–30 days
Compression Sheets Graphite, PTFE, rubber, cork, mica, non-asbestos 0.5–6 mm thickness Per material -200 to +650 °C ASTM F104 15–30 days
PTFE & PEEK Seals Virgin PTFE, modified PTFE, PEEK To drawing Per design -200 to +260 °C FDA, RoHS 15–30 days
Sealing Machines SWG winding, cutting, Kammprofile, double jacket, graphite, braiding, testing Per model — — CE where applicable Per model

Cases Reviewed Individually, Not Accepted by Default

Gasket OD above 3000 mm, pressure ratings outside ASME B16.20 or API 601 scope, packing for shaft speeds above the published limit, and PTFE parts requiring wall thickness below 1 mm are reviewed case by case before a quote is issued. If a specification falls outside the standard range, the engineering team says so on the quote rather than accepting the order and discovering the constraint in production.

Not sure whether your specification is inside the matrix?

Send Your Specification →
X
We use cookies to offer you a better browsing experience, analyze site traffic and personalize content. By using this site, you agree to our use of cookies. Privacy Policy
RejectAccept